Saraji Mine Optimised Stripping Workshop

Dysart, Queensland, Australia

To facilitate the acquisition of up to 50 additional Heavy Mining Equipment (HME), the BMA Saraji Mine (SRM) engaged Walz to build an extension to the existing workshop to include 4 additional Ultra-Class (UC) bays. 

As Principal Contractor, Walz scope included: 

  • All works associated with the relocation of existing buried services. 
  • Demolition of existing tool store on the western side of the existing HV Workshop. 
  • All bulk earthworks to building up the pad and hardstand for the new workshop extension (10,200m3) 
  • Bulk excavation for the pad footings. 
  • All concrete works for pad footings and pedestals. 
  • Formwork and concrete for new workshop slab (720m3) 
  • Supply, fabrication, surface treatment, erection and cladding of new workshop (65m long x 20m wide x 21m high). 
  • Supply and installation of electrical and mechanical works, including satellite tank farm and point of lube (POL). 
  • Testing and commissioning. 